West YorkshireBusiness Guide

EV Charging Installers in West Yorkshire

Installers of workplace, fleet and destination EV charging, from single units to managed multi-bay installations.

Businesses listed
6 across 6 towns
Category
Trades
Typical cost
A single 7kW workplace unit commonly £900–£1,600 installed; 22kW dual units £2,500–£4,500; DC rapid installations from £25,000.

About this sector

Workplace charging looks like an electrical job and is really a capacity job. The question that decides the project is whether the site’s incoming supply can carry the load, and what the Distribution Network Operator will allow.

In most of West Yorkshire that operator is Northern Powergrid, and installers who deal with them regularly move faster than those who do not.

Ranked lists in this sector

Our picks for the county and for individual towns.

  1. The Top 6 EV Charging Installers in West YorkshireWest Yorkshire6 businessesReviewed 3 September 2026

EV Charging Installers by town

Where the businesses in this sector are based.

Questions about ev charging installers

How much does workplace EV charging cost to install?

A single 7kW wall unit with a short cable run typically costs £900 to £1,600 installed. A 22kW dual-socket post serving two bays usually runs £2,500 to £4,500. Costs rise sharply with distance from the board, groundwork for cable routes, and any need to upgrade the incoming supply — a supply upgrade through the DNO can add £5,000 to £50,000 and several months. DC rapid charging starts around £25,000 per unit before civils.

Do I need permission from the electricity network to install chargers?

Usually yes. Anything above 3.68kW per phase requires notification to the Distribution Network Operator — Northern Powergrid across most of West Yorkshire — and larger installations require an application and formal approval before work starts. Small single installations can often be notified retrospectively within 28 days, but multi-unit or high-capacity schemes need approval first, and that timeline, not the electrical work, is usually what sets the project length.